General installation method of mineral processing machinery and equipment

Inspection and acceptance of mineral processing equipment foundation Before the installation of mineral processing equipment, the basis of the installation of ball milling equipment shall be strictly retested and inspected and accepted according to the information handed over by the civil engineering unit. Including the strength requirements of the foundation concrete, the basic dimensions of the foundation, the level of the foundation surface, the centerline, the elevation, the spacing of the anchor bolt holes, the embedded parts in the concrete, etc., whether it conforms to the design drawings, the installation construction drawings and the technical specifications of the construction acceptance. Requirements and inspection and acceptance according to the following standards: the dimensions of each part of the foundation shall meet the requirements of the design drawings, and the deviation shall meet the corresponding specification requirements; the accuracy and quantity of all embedded parts, including pre-buried anchor bolts, etc. shall be checked according to the design drawings. The base surface and the anchor bolt holes shall be cleaned; and there shall be no oil stains, and the exposed parts of the embedded parts shall be exposed to the foundation surface. Threaded nut and bolt of the protection to be good; when the base is too high leveled with a flat shovel, the original surface can be leveled, and then the polishing pad to pad the iron level is too low; base when the center deviation is too large, the Appropriately change the position of the anchor bolts; the foundation shall not have defects such as cracks, honeycombs, voids, exposed ribs, etc.; according to the baseline and reference points that have been reviewed, the vertical and horizontal centerlines are marked on the basis of each equipment and the indicators are easy to measure. Higher mark. Unpacking and inspection of mineral processing equipment Inspection, acceptance and storage of mineral processing equipment should be carried out under the participation of construction units, supervisors, manufacturers, construction units and other relevant personnel, and records should be made.

Equipment unpacking acceptance shall have a packing list, installation and operation instructions, quality inspection certificate or factory certificate, and the operation equipment must have a test operation record. According to the packing list, the number of equipment and its parts are counted, and the geometrical dimensions of the equipment and the damage are checked according to the equipment body map. If there are quality problems such as damage, deformation and insufficient local processing accuracy, it should be dealt with in advance. In addition, pay attention to the rotating parts and sliding parts of the equipment when inventory, do not rotate and slide until the anti-rust oil is not cleaned. The rust preventive oil removed by inspection should be reapplied after inspection. Equipment storage equipment and its components shall be properly kept and shall not be deformed, damaged, rusted, disordered or lost. At the same time, it is necessary to check whether the random data and special tools are complete, and the representatives of the parties will sign the equipment acceptance record. The equipment should be transported to the construction site as close as possible to the equipment foundation according to the equipment requirements. After the equipment is inspected and accepted, it shall be kept by the construction unit. After the ore dressing equipment is ready for line selection and the surface is cleaned, the line can be released. When placing the line, use the theodolite and level to measure the center line and elevation of the device, mark it on the center mark and the reference point, and finally use the ink line to eject the center line of the device and other reference lines. When releasing the thread, the ruler should be squared and straightened, and the size should be accurate.

Hydraulic Sweeper

An excavator hydraulic sweeper is a type of attachment that can be added to an excavator machine. It is used to sweep and clean various surfaces, such as roads, parking lots, and construction sites. The hydraulic sweeper is powered by the excavator's hydraulic system and consists of a rotating brush or broom that sweeps debris into a collection bin or hopper. The attachment can be adjusted to different angles and heights to accommodate different surfaces and debris types. It is commonly used in construction, landscaping, and municipal maintenance applications.

Hydraulic Rotary Broom,excavator sweeper broom,Hydraulic Road Sweeper,Hydraulic Sweeper Brush

CATSU Hydraulic Machinery Equipment Co.,Ltd , https://www.tiltrotatorcatsu.com

Posted on