Truck Mounted Water Well Drilling Rig (GL-III)

Model NO.: GL-III
Type: Truck Mounted Type
Hole Diameter: 120--1500(mm)
Hole Depth: 350(M)
Run of Rod: 3--4(M)
Drill Head Lifting Force(Kn): 130
Dimensions(L-W-H) Working: 9600*2950*7900(mm)
Transport Status (L-W-H): 10200*2470*3300(mm)
Supporting Form: Hydraulic Unit
Rig Mass: 12500(Kg)
Usage: Water Well
Power Type: Diesel
Trademark: GLORYTEK
Transport Package: Sea Worthy Packing.
Origin: Beijing, China
Model NO.: GL-III
Type: Truck Mounted Type
Hole Diameter: 120--1500(mm)
Hole Depth: 350(M)
Run of Rod: 3--4(M)
Drill Head Lifting Force(Kn): 130
Dimensions(L-W-H) Working: 9600*2950*7900(mm)
Transport Status (L-W-H): 10200*2470*3300(mm)
Supporting Form: Hydraulic Unit
Rig Mass: 12500(Kg)
Usage: Water Well
Power Type: Diesel
Trademark: GLORYTEK
Transport Package: Sea Worthy Packing.
Origin: Beijing, China
Truck Mounted Water Well Drilling Rig(GL-III)
 
Truck Mounted Water Well Drilling Rig (GL-III)

Advantage
 
 1. Move easily & good mobility
 2. High efficiency
 3. Commercial Price.
 
Application
 
1. Drilling wells for urban and rural life
2. Drilling wells for agricultural irrigation and industries
3. Drilling for geotechnical survey
4. Drilling construction engineering holes
5. Drilling geothermal pump wells
 
Picture for GL-III Truck Mounted Wayer well Drilling Rig
 
 
Technical Parameter 
 

Drilling Parameter
Hole diameter: 120--1500(mm)
Hole depth: 350(m)
Run Of Rod: 3,4(m)
Drill rod diameter: φ73 φ89 φ95 φ133(mm)
Drilling Technology: Normaland Reverse Circulation for both Mud and Air
Down-The-Hole hammers: Middle-High-Pressure Air
Performance parameter
Drill Head Inside Diameter: φ80 φ120
Drill Head lifting Force(kN): 130
Drill Head Spin Speed: A(Forward:20-33-73,Reverse:13-23-47r/min)
B(Forward:41-66-146,Reverse:26-43-94r/min)
B(Forward:36-58-127,Reverse:23-37-80r/min)
Shape Parameters
Dimensions: (L-W-H) Working conditions 9600×2950×7900(mm)
Transport status: (L-W-H) 10200×2470×3300(mm)
Supporting Form: Hydraulic Unit
Mast Up-Down: Hydraulic Unit
Rig mass: 12500(Kg)
Chassis: Dongfeng EQ 1141/JiefangCA1127 (four-wheel drive)
Power Unit: Diesel Engine
Power: 84(kW)
Pump: BW600/30 Mud Pump
Flow(m³/h): 720 513 335
Pressure(MP): 3 4 5
Main Hoist Lifting Force: 25(kN)
Auxiliary Hoist Lifting Force: 8(kN)
Notes: Drill head spin speed can be selected, A is normal

 
 Our Services
Delivery Time: Based on order quantity, normally it takes 30 days for production.Only 2 or 3 days if we have stock on your request size.
Quality Control: We have our professional QC and all the products will be strict inspection and testing for every order before shipping out. 
After Services: Technical Support will be available in any time. We could provide the professional suggestion for you.
EX: 1.Select the right most suitable products.
       2. According to the rock types, choosing the face type, button tooth type.
       3. According to the different purpose,. choosing the different body type 
 
Our Company 
 
Glorytek Industry (Beijing)Co.,Ltd., located inBeijing,China, is an integrated corporation specialized in manufacturing and exporting top quality drilling equipment and drilling parts for decades. We are supported and assisted by a highly experienced team of designers and engineers that enable us to complete all the assigned projects successfully as per the specified requirement from our clients.
 
Our products are widely used in the scope of mining, water well drilling and exploration, anchor grouting project, side slope protection engineering, oil and gas engineering,underwater rock drilling & blasting operations of seaport channel, hydropower project, national defense projects ect.   Truck Mounted Water Well Drilling Rig(GL-III)
 
Truck Mounted Water Well Drilling Rig (GL-III)

Advantage
 
 1. Move easily & good mobility
 2. High efficiency
 3. Commercial Price.
 
Application
 
1. Drilling wells for urban and rural life
2. Drilling wells for agricultural irrigation and industries
3. Drilling for geotechnical survey
4. Drilling construction engineering holes
5. Drilling geothermal pump wells
 
Picture for GL-III Truck Mounted Wayer well Drilling Rig
 
 
Technical Parameter 
 

Drilling Parameter
Hole diameter: 120--1500(mm)
Hole depth: 350(m)
Run Of Rod: 3,4(m)
Drill rod diameter: φ73 φ89 φ95 φ133(mm)
Drilling Technology: Normaland Reverse Circulation for both Mud and Air
Down-The-Hole hammers: Middle-High-Pressure Air
Performance parameter
Drill Head Inside Diameter: φ80 φ120
Drill Head lifting Force(kN): 130
Drill Head Spin Speed: A(Forward:20-33-73,Reverse:13-23-47r/min)
B(Forward:41-66-146,Reverse:26-43-94r/min)
B(Forward:36-58-127,Reverse:23-37-80r/min)
Shape Parameters
Dimensions: (L-W-H) Working conditions 9600×2950×7900(mm)
Transport status: (L-W-H) 10200×2470×3300(mm)
Supporting Form: Hydraulic Unit
Mast Up-Down: Hydraulic Unit
Rig mass: 12500(Kg)
Chassis: Dongfeng EQ 1141/JiefangCA1127 (four-wheel drive)
Power Unit: Diesel Engine
Power: 84(kW)
Pump: BW600/30 Mud Pump
Flow(m³/h): 720 513 335
Pressure(MP): 3 4 5
Main Hoist Lifting Force: 25(kN)
Auxiliary Hoist Lifting Force: 8(kN)
Notes: Drill head spin speed can be selected, A is normal

 
 Our Services
Delivery Time: Based on order quantity, normally it takes 30 days for production.Only 2 or 3 days if we have stock on your request size.
Quality Control: We have our professional QC and all the products will be strict inspection and testing for every order before shipping out. 
After Services: Technical Support will be available in any time. We could provide the professional suggestion for you.
EX: 1.Select the right most suitable products.
       2. According to the rock types, choosing the face type, button tooth type.
       3. According to the different purpose,. choosing the different body type 
 
Our Company 
 
Glorytek Industry (Beijing)Co.,Ltd., located inBeijing,China, is an integrated corporation specialized in manufacturing and exporting top quality drilling equipment and drilling parts for decades. We are supported and assisted by a highly experienced team of designers and engineers that enable us to complete all the assigned projects successfully as per the specified requirement from our clients.
 
Our products are widely used in the scope of mining, water well drilling and exploration, anchor grouting project, side slope protection engineering, oil and gas engineering,underwater rock drilling & blasting operations of seaport channel, hydropower project, national defense projects ect.  

The Arm Piece is used to be connect with Suction Pipe, Turning Gland, etc. 

Here comes the photo of our Arm Piece:

arm piece


Our cardanic joints/arm piece are available in a range from DN 600 up to DN 1400. Any other diameter is available on request. The units are made of a strong steel construction, which can be easily integrated into the side-suction pipe of all hopper dredgers. Cardanic joints/arm piece consist of two male arm pieces, a cardanic ring and a rubber fender hose.

The cardanic joint/arm piece allows movements of 30° in horizontal and vertical direction. It consists of two male arm pieces, a cardanic ring, a Rubber Hose and a rubber fender. The pivots are designed as steel shafts with high-wear-resistant bushes and have sufficient strength to bear the full load of the side suction pipe.


Arm Piece

Boat Arm Piece,Marine Arm Piece,Tribal Arm Piece,Arm Piece Marine

Unisite Group Ltd. , https://www.shipsparts.nl

Posted on