How to avoid decoration pollution in summer

Summer temperatures are high, and the pollution of home decoration has also entered the "high season" in summer. Due to the high temperatures in the summer, the relatively large changes in humidity, the construction conditions and the influence of the decoration materials, many people think that summer decoration is not a good season, but it is not. Summer decoration still has its own unique advantages, as long as we pay attention to details during construction, make full use of favorable factors, and try to avoid quality problems. Xi'an Ding Run came to tell everyone how to avoid decoration pollution in summer

1, in order to prevent the summer decoration pollution "high incidence" in the damage, in addition to try to use non-toxic and less toxic decoration materials, please repair the construction company on the right track, but also do a good job in the decoration room ventilation and air Purification. In the premise of agreeing to the situation, try to make the room more ventilation.

2, the summer data should also be reduced as much as possible in the construction site stacking, so that you can reduce the risk of convulsions, something as far as possible to adhere to data for a period of time, charged as far away from the data as possible, the best task area and data area to do a reasonable division.

3. Summer temperatures are high, the weather is boring, and there are many piles of information on the construction site. The data should be placed in the shade as much as possible to prevent internal fires from being caused by the air being not flowing and the temperature being too high.

4, home renovation often encounter latex paint due to dry slow, hot and humid weather in the mold will become a problem. In this regard, the general method of the decoration company is to open the air-conditioning dehumidifier, pumping away the moisture in the air; furniture cabinet door is not closed, adhere to ventilation. After the renovation, they will also encounter various problems that cannot be spread out and affect people's well-being. It is recommended to put more green plants after the renovation.

5. Paints and wallpapers are commonly used wall decorations. In the spring, due to the moist air, the doors and windows are open and airy to allow the walls to dry as quickly as possible. In the summer, there are differences. Due to boringness, the wallpaper must be placed in water before it is laid, and then it is brushed. If you open the doors and windows at this time, the wallpaper will be used to shorten the deformation due to agile water.

6, the summer purchase of wood products including construction of the main material Daxinban, accessories Baimu, Yinjiao line, the door line, the window frame line and the skirting along the wall, etc., are required to detect the moisture content of wood products. In the building materials market, ordinary wood finished franchise stores should have wood moisture measuring instruments. According to the rules of the country, the moisture content of the standard sheet cannot exceed 12%

High-demanding welded and high strength construction
Box anchor construction can be used for following purposes:
- Connection as an anchor to a cutter dredge side wire
- Lifting the box anchor with elements(could be stored 8 elements), under water for transport, for transport under water

- Loading and unloading elements in the box construction, underwater, for transport ashore

Photo of our Anchor Box:

Anchor Box



The construction is to be built according to the drawing with rules of good workmanship.

The box anchor consists of:

- a box anchor

- three anchoring pins with local reinforcement plates

- central anchoring pin with pulling eyes

- four reinforced openings

- one hosting eye of 200T

 

All fabricated steelwork used in the construction will be to manufacturing standard of normal or classification society.

All materials proposed will be selected to comply with the latest Health and Safety Rules.

Paint systems for hull protection will be of the highest quality (Hempel, Inter, Sigma, Jotun)

 

All welding will be performed in accordance with drawing and order and UniSite experience and all welding will be continuous and full penetration.

 

The workmanship have good marine practice. Care are taken to ensure fair lines, smooth surfaces and neat welding.

 

MAIN PARTICULARS

Tolerance

High accuracy(ISO2768, ISO5817, ISO13920)

Material

Q345D or other materials

Dimension(L*B*H)

As per drawing, as large as we can

Weight

19ton-22ton, total 220

Coating

Sa2.5 blasted and two or three layers painted with highest quality

Marking

as per clients' requirements

Inspection

material, construction, dimension, welding seam, non defective test, paint inspection

Others

Recyclable, in line with environmental requirements and standards, and reliable



Anchor Box

Steel Anchor Box,Customized Anchor Box,Blocks Anchor Box

Unisite Group Ltd. , http://www.shipsparts.nl

Posted on