This is from Steve Redick:
It was around 2:00 AM on Saturday morning. A large warehouse filled to the brim with old, flammable materials. The fire started in an outdoor trash and storage area beneath a canopy. For a while, it looked like the flames had made their way into the building itself. The structure had bar joist truss construction, and with heavy smoke and a lot of stored items inside, it turned into a defensive operation for most of the fire. Once the fire was under control, the Mobile Ventilation Unit (MVU) was used to clear the building. It could have been a real disaster, but everything went smoothly in the end.SteveÂYou can view all the photos and videos here:
Steve Redick photo
Steve Redick photo
Steve Redick photo
Steve Redick photo
Steve Redick photo
Steve Redick photo
Plastic Injection Molding Service
Plastic Injection Molding,Plastic Mold Design,Custom Plastic Molding,Plastic Injection Mold Tooling
Shenzhen ganzoo prototype manufacture co.,ltd , https://www.gz-proto.com